Talisker Reports Mustang Underground Face Sample Results Including 886 g/t over 0.51m within 254.5 g/t over 2.74m on 1060 Level and Defines a 60 metre Strike Length High-grade Shoot Averaging 27 g/t on the 1045 Level

TORONTO, April 15, 2026 (GLOBE NEWSWIRE) -- Talisker Resources Ltd. (“Talisker” or the “Company”) (TSX: TSK, OTCQB: TSKFF) is pleased to report the development on the newly established 1045 Level along the BK Vein at the Mustang Mine where the Company has successfully intersected a continuous 60-metre strike length of high-grade mineralization. The zone comprises a well-defined banded quartz vein averaging 27 grams per tonne (g/t) gold across an average width of 0.85 metres with a total of 384 visible gold occurrences across 17 of the 25 faces channeled on the structure. This result highlights the strong continuity of the mineralized structures within the Mustang Mine and further supports Talisker’s geological model. Ongoing development continues to demonstrate the robustness and expansion potential of the BK Vein system, reinforcing confidence in the asset’s ability to deliver consistent high-grade material.

Additionally, Talisker is pleased to report that new development along the BK Vein on the 1060 Level at the Mustang Mine has intersected a high-grade ore shoot, located approximately 15 metres beyond previously developed workings. This discovery underscores the significant upside potential for continued resource expansion at depth and along strike within the BK Vein system. 

Key Highlights:

  • 866 g/t over 0.51 m within 254.52 g/t over 2.74 m from BK Vein, West Face No. 11
  • 413 g/t over 0.38 m within 130.28 g/t over 1.30 m from BK Vein, East Face No. 26
  • 380 g/t over 0.35 m within 75.44 g/t over 1.88 m from BK Vein, East Face No. 2
  • 234 g/t over 0.57 m within 102.33 g/t over 1.32 m from BK Vein, East Face No. 28
  • 142 g/t over 0.40 m within 41.03 g/t over 1.44 m with from BK Vein, East Face No. 4
  • 89.8 g/t over 0.49 m within 33.62 g/t over 1.43 m from BK Vein, East Face No. 23
  • 80.3 g/t over 0.47 m within 24.40 g/t over 1.63 m from BK Vein, East Face No. 18
  • 66.9 g/t over 0.45 m within 19.53 g/t over 1.84 m from BK Vein, East Face No. 5
  • 32.3 g/t over 0.67 m within 17.65 g/t over 1.33 m from BK Vein, East Face No. 25
  • 26.9 g/t over 0.88 m within 12.51 g/t over 2.17 m from BK Vein, West Face No. 10
  • 14.6 g/t over 0.48 m within 6.03 g/t over 1.31 m from BK Vein, West Face No. 9

Terry Harbort, CEO of Talisker commented, “These new face sample results from the 1060 level and the new development on the 1045 level strongly support our upcoming stope extraction from these levels. With ramp and waste development also nearing completion on the 1030 level, we look forward to following these shoots further at depth.”

Bralorne Gold Project
Mustang Mine – 1045 & 1060 Lateral Development
Assay Results *
Channel Sample NameFrom
(m)
To
(m)
Interval
(m)
Au
(g/t)
Sample #
M1045_BK_OD_E1_F21.402.040.646.07X001446
M1045_BK_OD_E1_F22.042.530.492.03X001447
M1045_BK_OD_E1_F22.532.880.35380.00X001448
M1045_BK_OD_E1_F22.883.280.409.87X001449
M1045_BK_OD_E1_F40.861.901.042.20X001502
M1045_BK_OD_E1_F41.902.300.40142.00X001503
M1045_BK_OD_E1_F51.322.310.992.12X001509
M1045_BK_OD_E1_F52.312.710.409.33X001511
M1045_BK_OD_E1_F52.713.160.4566.90X001512
M1045_BK_OD_E1_F180.981.450.4780.30X001723
M1045_BK_OD_E1_F181.451.990.543.72X001724
M1045_BK_OD_E1_F181.992.610.620.03X001725
M1045_BK_OD_E1_F231.211.670.466.84X001831
M1045_BK_OD_E1_F231.672.160.4989.80X001832
M1045_BK_OD_E1_F232.162.640.481.94X001833
M1045_BK_OD_E1_F251.462.120.662.68X001878
M1045_BK_OD_E1_F252.122.790.6732.40X001879
M1045_BK_OD_E1_F261.292.210.9213.50X001887
M1045_BK_OD_E1_F262.212.590.38413.00X001888
M1045_BK_OD_E1_F280.631.380.752.26X001907
M1045_BK_OD_E1_F281.381.950.57234.00X001908
M1060_BK_OD_W1_F90.861.340.4814.60X001496
M1060_BK_OD_W1_F91.342.170.831.08X001497
M1060_BK_OD_W1_F101.582.340.764.24X001544
M1060_BK_OD_W1_F102.343.220.8826.90X001545
M1060_BK_OD_W1_F101.051.580.530.48X001543
M1060_BK_OD_W1_F111.101.970.872.22X001859
M1060_BK_OD_W1_F111.972.570.601.25X001861
M1060_BK_OD_W1_F112.572.960.3913.20X001862
M1060_BK_OD_W1_F112.963.470.51866.00X001863
M1060_BK_OD_W1_F113.473.840.37670.00X001864
* Estimated true widths are between 80% and 100% of interval lengths.


Bralorne Gold Project – Channel Collar Locations Table (values rounded to nearest metre)
Channel Sample NameUTM EastingUTM NorthingElevation
(m)
M1045_BK_OD_E1_F25625458513380.61048.274
M1045_BK_OD_E1_F45625457513385.41048.376
M1045_BK_OD_E1_F55625458513387.91048.301
M1045_BK_OD_E1_F185625455513412.71048.258
M1045_BK_OD_E1_F235625457513423.31048.908
M1045_BK_OD_E1_F255625458513428.21048.392
M1045_BK_OD_E1_F265625457513430.21048.370
M1045_BK_OD_E1_F285625457513434.71048.378
M1060_BK_OD_W1_F95625460513279.71063.872
M1060_BK_OD_W1_F105625459513278.21063.967
M1060_BK_OD_W1_F115625458513275.51064.067


Bralorne Gold Project – Channel Collar Orientations Table
Channel Sample NameAzimuth
(o)
Dip
(o)
Total Length
(m)
M1045_BK_OD_E1_F217805.93
M1045_BK_OD_E1_F418403.12
M1045_BK_OD_E1_F517803.16
M1045_BK_OD_E1_F1817603.70
M1045_BK_OD_E1_F2317003.19
M1045_BK_OD_E1_F2518203.33
M1045_BK_OD_E1_F2618403.35
M1045_BK_OD_E1_F2817702.97
M1060_BK_OD_W1_F931403.54
M1060_BK_OD_W1_F1031803.22
M1060_BK_OD_W1_F1133903.84